PUBLISHED : 1 Oct 2023 at 13: 25 RAYONG: The Eastern Economic Corridor Office of Thailand (EECO) hasactually authorized a feeder electrical train connecting with a high-speed rail link inbetween the capital’s airports and U-Tapao airport in the high-speed rail job’s 2nd hearing. The public hearing panel was justrecently arranged by EECO in Ban Chang district and signedupwith by regional administration agents with a primary focus on a advancement strategy for feeder transportation for the high-speed train. According to Karn Chaloemwongphan, EECO’s traffic and transportation design professional, 2 primary train systems were proposed to the hearing panel: a road-tyre-based system and a repaired guideway-based system. The panel had concurred on the 2nd approach, with 2 types of train and train systems to thinkabout. According to Mr Karn, they were a traditional rail-based system, such as Light Rail Transit (LRT)
Read More.